Job TypeRoof Surveying
CompanyGeoPoint Ltd.
CountryIsrael
Project DateOctober 2015
Number of Images800
Accuracybetter than 2 cm (0.065 ft)
DatuGramTM3D savings9 field days instead of 36 days 22 office days instead 45 days

Project Description

Survey a big roof of 40,000 [m2] (9 acres) including its facilities and objects and create a detailed map of the roof. Fieldwork, using conventional surveying techniques, entailed several major challenges: safety, complex structures and obstructions.

The estimated effort using conventional surveying techniques reached 81 Days:

  • 36 field days, using a crew of two people using Total Station measurements and RTK.
  • 45 office days to create a CAD model of the roof and its facilities, utilizing the Total Station and RTK measurements, and the field sketch.

Data Acquisition

pole-photoshootingA regular Samsung NX Mini 20MP camera was used. The camera was mounted on an 8-meter (24 foot) high telescopic pole, and was controlled via a smartphone using a remote control Wi-Fi app.

The area was divided into 16 sections and each section was photographed in a circle pattern.

DatuGram™3D Savings

The actual effort to survey and create an accurate 3D CAD model was 31 days (instead of 81):

Total of 9 days in the field (instead of 36)

  • 6 field days to set targets, survey them and measure 200 control points in the area. Control points were measured using a prism-less Total Station device and RTK.
  • 3 field days to photograph the site using a telescopic pole (due to UAV flight restriction in the area)

22 office days (instead of 45) to geo-reference the data (overall 16 DatuGram3D projects), generate an accurate 3D CAD model, and create more than 2500 new 3D points.

9-acre-roof-1-min

Achieved Results

A 3D CAD model in DXF format was created. It included air condition facilities, pipe arrangements, roof structure and all other objects on the roof. The model was generated by drafting directly on the images using DatuGramTM3D.

A point file, including names, codes, descriptions and coordinates of all new points, was also generated. Overall, more than 2500 new points were drafted directly on the images.

The measurement accuracy of all the points was better than 2 cm (0.065 ft.) in both position and elevation.

9-acre-roof-2

See how your peers are using Datumate solutions...

A14 Road and Railway Intersection Surveying for SKANSKA

As part of the UK’s A14 improvement scheme which is one of the UK’s largest road projects, it was required to map a busy A14 highway junction including a highway intersection and a railway line. The complex mapping included multiple infrastructure layers (bridge, road and railway line) as well as an accurate snapshot of the surrounding buildings to avoid future damage claims during road reconstruction work.

Read this case study »

Quantity Check Surveying

Courts at Clarksburg is an area that is being prepared for building homes. The area surveyed is an open area where infrastructure work has been done. The objective of this project is to survey the area to check the level of filled slab areas in an effort to compare it to the planned levels. And also to check quantities of cut and fill needed to finish the prep work.

Read this case study »
residential surveying

Residential Community Surveying

The objective of this project is to survey a residential area and detect changes in structures for property taxation purposes. The area surveyed included about 50 houses which were clearly shown on an orthophoto and as a dense point cloud as well.

Read this case study »
Survey of Baseball Stadium

Baseball Stadium Surveying

Doppler radar is being implemented in baseball and softball venues around the world to track the trajectory of pitched and hit balls. All physical obstructions that are within the azimuth of the Doppler radar field of view were identified using the model.

Read this case study »
Scroll to Top