Electricity Tower Surveying

Share on facebook
Share on twitter
Share on linkedin
Job TypeElectricity Tower Surveying
CompanyIsraeli Electric Company
CountryIsrael
DroneDJI S1000
Pattern of flightVerical
AccuracyBetter than 2cm (0.05 ft.)
DatuSurvey savings40 min in the field instead of 2 days using prism and prism-less Total Station 4 hours at the office instead of 1 day

Project Description

The Israeli Electric Company needed to survey a quad pod electricity tower and draft a 3D CAD plan with accuracy better than 2cm (0.05ft).

The estimated effort, using conventional surveying techniques, was 3 days:

  • 2 field days using both prism and prism-less Total Station devices.
  • 1 day office day to draft the detailed CAD plan, based on the Total Station measurements and a sketch done in the field.

Data Acquisition

Acquiring Images

The tower was photographed using a regular Sony NEX-7 camera (24-megapixel resolution) with a 16mm wide-angle lens, mounted on a small quadcopter that flew at 35 – 45 meters (120 to 150ft) above ground.

A total of 31 images of the tower were captured, from the perimeter around the tower toward its center, with an image taken about every 15 meters (50 feet).

Acquiring Ground Control Points

A total of 27 points were measured on the electricity tower and around it, using a prism-less Total Station device. 10 of these points were used as control points for geo-referencing the images.

The chosen control points were high-contrast, well-defined objects, such as corners of the tower, devices mounted on it, etc.

DatuSurvey™ Professional (formerly DatGram™3D) Savings

The actual time to survey and draft a 3D CAD model of the electricity tower was less than 1 day:

  • 40 minutes in the field: 10 minutes to photoshoot the electricity tower, and additional 30 minutes to measure control points around it.
  • 4 office hours to geo-reference the images and draft the 3D CAD model of the electricity tower directly on the images.

electricity-tower-1

Achieved Results

A 3D CAD model, in DXF format, was generated by drafting directly on the images, using the DatuSurveyTM Professional (formerly DatuGramTM3D) photogrammetry software.

A list of all measured points, in PNT format, was generated. This included point names, codes, descriptions, coordinates, and their measurement accuracies in all axes.

373 new measurements were made using the images. The measurement accuracy of all points was better than 2cm (0.05 ft.) in both position and elevation.

electricity-tower-2

See how your peers are using Datumate solutions...

A14 Road and Railway Intersection Surveying for SKANSKA

As part of the UK’s A14 improvement scheme which is one of the UK’s largest road projects, it was required to map a busy A14 highway junction including a highway intersection and a railway line. The complex mapping included multiple infrastructure layers (bridge, road and railway line) as well as an accurate snapshot of the surrounding buildings to avoid future damage claims during road reconstruction work.

Read this case study »

Quantity Check Surveying

Courts at Clarksburg is an area that is being prepared for building homes. The area surveyed is an open area where infrastructure work has been done. The objective of this project is to survey the area to check the level of filled slab areas in an effort to compare it to the planned levels. And also to check quantities of cut and fill needed to finish the prep work.

Read this case study »

Residential Community Surveying

The objective of this project is to survey a residential area and detect changes in structures for property taxation purposes. The area surveyed included about 50 houses which were clearly shown on an orthophoto and as a dense point cloud as well.

Read this case study »

Baseball Stadium Surveying

Doppler radar is being implemented in baseball and softball venues around the world to track the trajectory of pitched and hit balls. All physical obstructions that are within the azimuth of the Doppler radar field of view were identified using the model.

Read this case study »
Scroll to Top